04A200 - Install Fiber In Conduit 1- 144f (price per foot, fiber provided by FirstLight)
per ft
04A200 - Install Fiber In Conduit 145- 431f (price per foot, fiber provided by FirstLight)
per ft
04A200 - Install Fiber In Conduit 432- 864f (price per foot, fiber provided by FirstLight)
per ft
04A200 - Install Cable in Conduit Power Space Adder
per ft
04A200 - UG Innerduct-Install 1 1/4" duct in conduit. (Innerduct provided by the contractor)
per ft/each
04A200 - UG Innerduct-Install 3/4" duct in conduit. (Innerduct provided by the contractor)
per ft/each
04A200 - UG Innerduct-Install 1/2" duct in conduit. (Innerduct provided by the contractor)
per ft/each
04A200 - Install Innerduct in Conduit Power Space Adder
per ft/each
04A200 - Install 2" 3 cell-Maxcell in Conduit. (Maxcell provided by contractor)
per ft/each
04A200 - Install 2" 3 cell Maxcell in Conduit Power Space Adder. (Maxcell provided by contractor)
per ft/each
04A200 - Rod & Rope & Mule tape (price per foot including detectable muletape)
per ft
04A200 - Rod & Rope & Mule tape in Conduit Power Space Adder
per ft
04A200 - Open Trench in Grass (Install 2" conduit or less)
per ft
04A200 - Open Trench in Grass (Install greater than 2" up to 4" conduit)
per ft
04A200 - Open Trench in Asphalt / Concrete (Price based on local restoration specifications-most likely a bid job)
per ft
04A200 - Directional Drill (1) 2" conduit or less
per ft
04A200 - Directional Drill Rock Adder
per ft
04A200 - Supply/Install a 35' class 5 utility pole in earth
per each
04A200 - Install Screw Anchor with poleset, 1" x 7' rod w/ triple eye, 10" helix
per each
04A200 - Install Screw Anchor without poleset, 1" x 7' rod w/ triple eye, 10" helix
per each
04A200 - Install Ledge Anchor/Pin with poleset, 30" Ledge Pin
per each
04A200 - Install Ledge Anchor/Pin without poleset, 30" Ledge Pin
per each
04A200 - Install 17x30x17 Fiberglass Hand Hole, 20K lb. cover rating (Firstlight will provide hand hole)
per each
04A200 - Install 24x36x30 Cement Handhole w/locking cover, 20k lb cover rating (Firstlight will provide hand hole)
per each
04A200 - Install Round 8" Fiberglass Fiber ped- Charles Industry BDG3 (Firstlight will provide ped)
per each
04A200 - Install 6' copper ground rod in fiber ped or hand hole, this is so we can bond our shielded fiber/closure safely
per each
04A200 - UnRack/Rack Telecom Manhole Splice
per each
04A200 - UnRack/Rack Power Manhole Splice
per each
2.00
2025-12-12: unrack closure from power manhole, rack manhole into power manhole
04A200 - Pump (De-Water) Manhole
per each
1.00
Unit
Quantity
Notes
BUILDING UNITS - CONSTRUCTION
04A100 - Site Survey (PDF MOP prepared)
per each
04A100 - Building Attachment
per each
04A100 - Cleat cable to pole or building
per foot
04A100 - Wall Bore Building Entry Wood/Brick/Block up to 4"
per each
04A100 - Interior Core Wood/Drywall all sizes
per each
04A100 - Concrete Core 2" to 4" Wall/Floor includes fire stop
per each
04A100 - Rod & Rope interior empty or occupied conduit including non-detectable muletape
per each
04A100 - Install Interior Plenum Fiber (price per foot, fiber provided by FirstLight)
per ft
04A100 - Install Interior 1" Plenum Duct (zip tied in crawl space, chase way, conduit or ceiling area)
per ft
Unit
Quantity
Notes
ADDITIONAL UNITS - CONSTRUCTION
04A300 - Police Detail (billed at cost plus 10% TBD by each Town)
total
04B000 - Fiber Splicer (Including Labor, Equipment and Vehicle)
total
6.00
2025-12-12: 3 techs 2 hours - Car was parked on top of manhole and in a no parking area - had to work with city to get the vehicle moved to complete MH entry, and closure entry to splice circuit through, 1 tech was at CO waiting to send tone and check splices
04A100 - Two-man Construction Crew (Includes Labor, Equipment and Vehicle)
total
04A100 - Supervisor ( Includes labor & Vehicle)
total
04A300 - Flaggers (per each, per hour)
total
04B000 - Per-Diem (if overnight travel is required)
per each
03C100 - Set Up Fee (Jobs w/ Gross Value < $1,000 or > 75 mile radius from contractors office)
per each
Unit
Quantity
Notes
SPLICING UNITS
04B000 - Install Fiber Rack/Wall/Pole mount FDP and splice 6 fibers (FDP supplied by FirstLight)
per each
04B000 - Install Fiber Rack/Wall/Pole mount FDP and splice 12 fibers (FDP supplied by FirstLight)
per each
04B000 - Install/Supply backboard (contractor provides the plywood backboard)
per each
04B000 - Enter Fiber FDP/Rack/Wall/Pole Mount/ONT/Cabinet (SPLICING/PATCHING STRANDS THRU ONLY)
per each
2.00
2025-12-12: Entered 2 FDP's at 340 cumberland firstlight cage and patched 2 fibers into 2 panels
04B000 - Install 6 pack w/pigtail in rackmount and splice 6 fibers (Provided by Firstlight)
per each
04B000 - Install 12 pack w/pigtail in rackmount and splice 12 fibers (Provided by Firstlight)
per each
04B000 - Install SNAP (Residential fiber closure)
per each
04B000 - Open / Split buffer tube in existing SNAP
per each
04B000 - Prep additional fiber into SNAP
per each
04B000 - Enter SNAP (SPLICING/PATCHING STRANDS THRU ONLY)
per each
04B000 - Coyote Drop Enclosure(DTC-101) (For Fiber Drop Restoration) (Provided by contractor)