04A200 - Install Fiber In Conduit 1- 144f (price per foot, fiber provided by FirstLight)
per ft
04A200 - Install Fiber In Conduit 145- 431f (price per foot, fiber provided by FirstLight)
per ft
04A200 - Install Fiber In Conduit 432- 864f (price per foot, fiber provided by FirstLight)
per ft
04A200 - Install Cable in Conduit Power Space Adder
per ft
04A200 - UG Innerduct-Install 1 1/4" duct in conduit. (Innerduct provided by the contractor)
per ft/each
04A200 - UG Innerduct-Install 3/4" duct in conduit. (Innerduct provided by the contractor)
per ft/each
04A200 - UG Innerduct-Install 1/2" duct in conduit. (Innerduct provided by the contractor)
per ft/each
04A200 - Install Innerduct in Conduit Power Space Adder
per ft/each
04A200 - Install 2" 3 cell-Maxcell in Conduit. (Maxcell provided by contractor)
per ft/each
04A200 - Install 2" 3 cell Maxcell in Conduit Power Space Adder. (Maxcell provided by contractor)
per ft/each
04A200 - Rod & Rope & Mule tape (price per foot including detectable muletape)
per ft
04A200 - Rod & Rope & Mule tape in Conduit Power Space Adder
per ft
04A200 - Open Trench in Grass (Install 2" conduit or less)
per ft
04A200 - Open Trench in Grass (Install greater than 2" up to 4" conduit)
per ft
04A200 - Open Trench in Asphalt / Concrete (Price based on local restoration specifications-most likely a bid job)
per ft
04A200 - Directional Drill (1) 2" conduit or less
per ft
04A200 - Directional Drill Rock Adder
per ft
04A200 - Supply/Install a 35' class 5 utility pole in earth
per each
04A200 - Install Screw Anchor with poleset, 1" x 7' rod w/ triple eye, 10" helix
per each
04A200 - Install Screw Anchor without poleset, 1" x 7' rod w/ triple eye, 10" helix
per each
04A200 - Install Ledge Anchor/Pin with poleset, 30" Ledge Pin
per each
04A200 - Install Ledge Anchor/Pin without poleset, 30" Ledge Pin
per each
04A200 - Install 17x30x17 Fiberglass Hand Hole, 20K lb. cover rating (Firstlight will provide hand hole)
per each
04A200 - Install 24x36x30 Cement Handhole w/locking cover, 20k lb cover rating (Firstlight will provide hand hole)
per each
04A200 - Install Round 8" Fiberglass Fiber ped- Charles Industry BDG3 (Firstlight will provide ped)
per each
04A200 - Install 6' copper ground rod in fiber ped or hand hole, this is so we can bond our shielded fiber/closure safely
per each
04A200 - UnRack/Rack Telecom Manhole Splice
per each
04A200 - UnRack/Rack Power Manhole Splice
per each
04A200 - Pump (De-Water) Manhole
per each
Unit
Quantity
Notes
BUILDING UNITS - CONSTRUCTION
04A100 - Site Survey (PDF MOP prepared)
per each
04A100 - Building Attachment
per each
04A100 - Cleat cable to pole or building
per foot
04A100 - Wall Bore Building Entry Wood/Brick/Block up to 4"
per each
04A100 - Interior Core Wood/Drywall all sizes
per each
04A100 - Concrete Core 2" to 4" Wall/Floor includes fire stop
per each
04A100 - Rod & Rope interior empty or occupied conduit including non-detectable muletape
per each
04A100 - Install Interior Plenum Fiber (price per foot, fiber provided by FirstLight)
per ft
04A100 - Install Interior 1" Plenum Duct (zip tied in crawl space, chase way, conduit or ceiling area)
per ft
Unit
Quantity
Notes
ADDITIONAL UNITS - CONSTRUCTION
04A300 - Police Detail (billed at cost plus 10% TBD by each Town)
total
04B000 - Fiber Splicer (Including Labor, Equipment and Vehicle)
total
04A100 - Two-man Construction Crew (Includes Labor, Equipment and Vehicle)
total
04A100 - Supervisor ( Includes labor & Vehicle)
total
04A300 - Flaggers (per each, per hour)
total
04B000 - Per-Diem (if overnight travel is required)
per each
03C100 - Set Up Fee (Jobs w/ Gross Value < $1,000 or > 75 mile radius from contractors office)
per each
Unit
Quantity
Notes
SPLICING UNITS
04B000 - Install Fiber Rack/Wall/Pole mount FDP and splice 6 fibers (FDP supplied by FirstLight)
per each
04B000 - Install Fiber Rack/Wall/Pole mount FDP and splice 12 fibers (FDP supplied by FirstLight)
per each
1.00
04B000 - Install/Supply backboard (contractor provides the plywood backboard)
per each
04B000 - Enter Fiber FDP/Rack/Wall/Pole Mount/ONT/Cabinet (SPLICING/PATCHING STRANDS THRU ONLY)
per each
3.00
2025-09-22: Entered 1 cabinet for Patching, 1 wallmount entrance DEMARC push fiber to server room, entered rack mount prepped plenum that was exisiting into rack and spliced 1 going to final FDP
04B000 - Install 6 pack w/pigtail in rackmount and splice 6 fibers (Provided by Firstlight)
per each
04B000 - Install 12 pack w/pigtail in rackmount and splice 12 fibers (Provided by Firstlight)
per each
04B000 - Install SNAP (Residential fiber closure)
per each
04B000 - Open / Split buffer tube in existing SNAP
per each
04B000 - Prep additional fiber into SNAP
per each
04B000 - Enter SNAP (SPLICING/PATCHING STRANDS THRU ONLY)
per each
1.00
04B000 - Coyote Drop Enclosure(DTC-101) (For Fiber Drop Restoration) (Provided by contractor)
04A100 - Wall Bore Building Entry Wood/Brick/Block up to 4"
per each
04A100 - Interior Core Wood/Drywall all sizes
per each
04A100 - Concrete Core 2" to 4" Wall/Floor includes fire stop
per each
04A100 - Rod & Rope interior empty or occupied conduit including non-detectable muletape
per each
04A100 - Install Interior Plenum Fiber (price per foot, fiber provided by FirstLight)
per ft
100.00
04A100 - Install Interior 1" Plenum Duct (zip tied in crawl space, chase way, conduit or ceiling area)
per ft
Unit
Quantity
Notes
ADDITIONAL UNITS - SPLICING
04A300 - Police Detail (billed at cost plus 10% TBD by each Town)
total
04B000 - Fiber Splicer (Including Labor, Equipment and Vehicle)
total
10.00
2025-09-22: 2 hour 5 techs - waiting on multiple access points. dealing with 3 different site contacts for access, and site walk through multiple hangers, and multiple offices.
04A100 - Two-man Construction Crew (Includes Labor, Equipment and Vehicle)
total
04A100 - Supervisor ( Includes labor & Vehicle)
total
4.00
2025-09-22: Completed Site visit with Engineer to go over the whole job and multiple buildings we needed to go through. Had to be onsite to show crew all the locations we needed to be at, which was an additional 2 hours onsite with the guys
04A300 - Flaggers (per each, per hour)
total
04B000 - Per-Diem (if overnight travel is required)
per each
03C100 - Set Up Fee (Jobs w/ Gross Value < $1,000 or > 75 mile radius from contractors office)