8764
Date
2025-06-04
SO#
205726-002 PO0000417049
Customer
City Of Auburn
Address
60 Court St, Auburn MAINE
Tech Hours
34
Job Complete
Yes
Tech Names
2025-05-28: Charlie & Seth Fiber Techs 9 hrs ea. || Trevor and Cam Lineman 6 hrs ea
2025-05-29: Charlie
Unit
Quantity
Notes
AERIAL CONSTRUCTION UNITS
04A100 - Aerial 12 Fiber Drop (price per foot included P-hanger, preforms and lags, fiber provided by FirstLight)
per ft
04A100 - Install 5/16" Strand and pole hardware (includes strand/pole hardware in material pricing) (10M)
per ft
04A100 - Install 5/16" Strand and pole hardware (without strand in material pricing but includes pole hardware) (10M)
per ft
04A100 - Install 1/4" Strand and pole hardware (includes strand/pole hardware in material pricing) (6M)
per ft
04A100 - Install 1/4" Strand and pole hardware (without strand in material pricing but includes pole hardware) (6M)
per ft
04A100 - Re-sag plant (includes redresssing the poleā¦respace, shorten or lengthen lashing wire)
per span
04A100 - Wreck out (includes all hardware, strand, fiber, and disposal)
per ft
04A100 - Install/ supply 5/16" Down guy (includes appropriate hardware and 6' guard, includes strand)
per each
04A100 - Install/ supply 5/16" Down guy (includes appropriate hardware and 6' guard, without strand)
per each
04A100 - Install/ supply 5/16" Aerial guy (includes appropriate hardware and strand)
per each
04A100 - Install/ supply 5/16" Aerial guy (includes appropriate hardware, without strand)
per each
04A100 - Install/ supply 1/4" Down guy (includes appropriate hardware and 6' guard, includes strand)
per each
04A100 - Install/ supply 1/4" Down guy (includes appropriate hardware and 6' guard, without strand)
per each
04A100 - Install/ supply 1/4" Aerial guy (includes appropriate hardware and strand)
per each
04A100 - Install/ supply 1/4" Aerial guy (includes appropriate hardware, without strand)
per each
04A100 - Install/supply 5/16" sidewalk guy (includes appropriate hardware and 6' guard, includes strand)
per each
04A100 - Install/ supply 5/16" sidewalk guy (includes appropriate hardware and 6' guard, without strand)
per each
04A100 - Install/ supply 1/4" sidewalk guy (includes appropriate hardware and 6' guard, includes strand)
per each
04A100 - Install/ supply 1/4" sidewalk guy (includes appropriate hardware and 6' guard, without strand)
per each
04A100 - Install Power Vertical Bonds (includes all copper and hardware)
per each
04A100 - Install Ground Rod (includes all copper and hardware)
per each
04A100 - X-Arm Supply & Install (Fiberglass 12")
per each
04A100 - X-Arm Supply & Install (Fiberglass 24")
per each
04A100 - X-Arm Supply & Install (Fiberglass 36")
per each
04A100 - Pole Transfer - Straight
per each
04A100 - Pole Transfer - Curved
per each
04A100 - Pole Transfer - Junction
per each
04A100 - Pole Transfer - Dead End
per each
04A100 - Pole Transfer - Four Way Junction or more
per each
04A100 - Install Fiber 001 - 144 (fiber provided by FirstLight)
per ft
04A100 - Install Fiber 145 - 288 (fiber provided by FirstLight)
per ft
04A100 - Install Fiber 289 - 432 (fiber provided by FirstLight)
per ft
04A100 - Install Fiber 433 - 864 (fiber provided by FirstLight)
per ft
04A100 - Delash Only Up to 4 lashing wires
per ft
04A100 - Relash Only
per ft
04A100 - Delash / Relash
per ft
Unit
Quantity
Notes
UNDERGROUND UNITS
04A200 - Install Fiber In Conduit 1- 144f (price per foot, fiber provided by FirstLight)
per ft
506.00
2025-05-28: all in existing innerduct with string
04A200 - Install Fiber In Conduit 145- 431f (price per foot, fiber provided by FirstLight)
per ft
04A200 - Install Fiber In Conduit 432- 864f (price per foot, fiber provided by FirstLight)
per ft
04A200 - Install Cable in Conduit Power Space Adder
per ft
04A200 - UG Innerduct-Install 1 1/4" duct in conduit. (Innerduct provided by the contractor)
per ft/each
04A200 - UG Innerduct-Install 3/4" duct in conduit. (Innerduct provided by the contractor)
per ft/each
04A200 - UG Innerduct-Install 1/2" duct in conduit. (Innerduct provided by the contractor)
per ft/each
04A200 - Install Innerduct in Conduit Power Space Adder
per ft/each
04A200 - Install 2" 3 cell-Maxcell in Conduit. (Maxcell provided by contractor)
per ft/each
04A200 - Install 2" 3 cell Maxcell in Conduit Power Space Adder. (Maxcell provided by contractor)
per ft/each
04A200 - Rod & Rope & Mule tape (price per foot including detectable muletape)
per ft
04A200 - Rod & Rope & Mule tape in Conduit Power Space Adder
per ft
04A200 - Open Trench in Grass (Install 2" conduit or less)
per ft
04A200 - Open Trench in Grass (Install greater than 2" up to 4" conduit)
per ft
04A200 - Open Trench in Asphalt / Concrete (Price based on local restoration specifications-most likely a bid job)
per ft
04A200 - Directional Drill (1) 2" conduit or less
per ft
04A200 - Directional Drill Rock Adder
per ft
04A200 - Install 17x30x17 Fiberglass Hand Hole, 20K lb. cover rating (Firstlight will provide hand hole)
per each
04A200 - Install 24x36x30 Cement Handhole w/locking cover, 20k lb cover rating (Firstlight will provide hand hole)
per each
04A200 - Install Round 8" Fiberglass Fiber ped- Charles Industry BDG3 (Firstlight will provide ped)
per each
04A200 - Install 6' copper ground rod in fiber ped or hand hole, this is so we can bond our shielded fiber/closure safely
per each
04A200 - UnRack/Rack Telecom Manhole Splice
per each
04A200 - UnRack/Rack Power Manhole Splice
per each
2.00
2025-05-28: unracked closure from power hole and racked back in after completion
04A200 - Pump (De-Water) Manhole
per each
2.00
Unit
Quantity
Notes
BUILDING UNITS
04A100 - Site Survey (PDF MOP prepared)
per each
04A100 - Building Attachment
per each
04A100 - Cleat cable to pole or building
per foot
04A100 - Wall Bore Building Entry Wood/Brick/Block up to 4"
per each
04A100 - Interior Core Wood/Drywall all sizes
per each
04A100 - Concrete Core 2" to 4" Wall/Floor includes fire stop
per each
04A100 - Rod & Rope interior empty or occupied conduit including non-detectable muletape
per each
04A100 - Install Interior Plenum Fiber (price per foot, fiber provided by FirstLight)
per ft
04A100 - Install Interior 1" Plenum Duct (zip tied in crawl space, chase way, conduit or ceiling area)
per ft
Unit
Quantity
Notes
SPLICING UNITS
04B000 - Install Fiber Rack/Wall/Pole mount FDP and splice 6 fibers (FDP supplied by FirstLight)
per each
04B000 - Install Fiber Rack/Wall/Pole mount FDP and splice 12 fibers (FDP supplied by FirstLight)
per each
1.00
2025-05-29: Installed a 2U 48 fiber APC and only spliced 12 due to no parts
04B000 - Install/Supply backboard (contractor provides the plywood backboard)
per each
04B000 - Enter Fiber FDP/Rack/Wall/Pole Mount/ONT/Cabinet (SPLICING/PATCHING STRANDS THRU ONLY)
per each
04B000 - Install 6 pack w/pigtail in rackmount and splice 6 fibers (Provided by Firstlight)
per each
04B000 - Install 12 pack w/pigtail in rackmount and splice 12 fibers (Provided by Firstlight)
per each
04B000 - Install SNAP (Residential fiber closure)
per each
04B000 - Open / Split buffer tube in existing SNAP
per each
04B000 - Prep additional fiber into SNAP
per each
04B000 - Enter SNAP (SPLICING/PATCHING STRANDS THRU ONLY)
per each
04B000 - Coyote Drop Enclosure(DTC-101) (For Fiber Drop Restoration) (Provided by contractor)
per each
04B000 - Install additional fiber tail into fiber closure (Tyco's, Coyotes & Raychems)
per each
1.00
2025-05-28: existing closure in CMP manhole, heat shrink boot style closure
04B000 - Prep/Install Ring Cut Splice Closure (Tyco C or D)
per each
04B000 - Prep/Install Butt Splice Closure (Tyco C or D)
per each
1.00
04B000 - Prep/Install end splice closure on a single fiber tail to feed a drop (Tyco C or D)
per each
04B000 - Open / Split Buffer Tube in existing fiber closure (Tyco's, Coyotes & Raychems)
per each
04B000 - Add snowshoe (adding single snowshoe to exisitng slack loop or splice) (17" snowshoe provided by contractor)
per each
04B000 - Enter Tyco/Coyote/Raychem or equivalent-(Splice prep charge less than 12 fibers spliced, anything over 12, the entry fee charge is waved.)
per each
1.00
04A100 - Strap Out Splice Closure (Deltec / Heads)
per each
04A100 - De/Re Splice Enclosure
per each
04B000 - Fiber Splices 1-12
per fiber
12.00
04B000 - Fiber Splices 13-36
per fiber
04B000 - Fiber Splices 37-60
per fiber
48.00
04B000 - Fiber Splices 61-72
per fiber
04B000 - Fiber Splices 73-96
per fiber
04B000 - Fiber Splices 97-144
per fiber
04B000 - Fiber Splices >145
per fiber
04B000 - 1-36 Ribbon (1 to 3 ribbon, price per ribbon)
per ribbon
04B000 - 36-72 Ribbon (3 to 6 ribbon, price per ribbon)
per ribbon
04B000 - > 72 Ribbon (price per ribbon)
per ribbon
04B000 - Ribbonizing/De-ribbonizing per ribbon
per ribbon
Unit
Quantity
Notes
SPLICING MATERIAL
Materials - 04D100 - Add closure Tyco C
per each
Materials - 04D100 - Add closure Tyco D
per each
Materials - 04D100 - Add closure Tyco 600
per each
Materials - 04D100 - Add tray Tyco C
per each
Materials - 04D100 - Add tray Tyco D or 600
per each
Materials - 04D100 - Add Slack Basket Tyco C
per each
Materials - 04D100 - Add Slack Basket Tyco D or 600
per each
Materials - 04D100 - Add Mounting Bracket Tyco 600
per each
Materials - 04D100 - Add Mounting Bracket Tyco D or C
per each
Materials - 04D100 - Add Gel drop seal kit for Tyco
per each
1.00
2025-05-28: (didnt use this item but we used a heat shrink boot for the old FOSC450D out of our own stock
Unit
Quantity
Notes
ADDITIONAL UNITS
04A300 - Police Detail (billed at cost plus 10% TBD by each Town)
total
04B000 - Fiber Splicer (Including Labor, Equipment and Vehicle)
total
9.00
2025-05-28: 2 at 3 hours - manholes were not recorded properly on prints. Worked with engineers and cmp to determine where the manhole was that had FL closure in it. tested a cable out of the first manhole next to customer and found the cable going 430 feet. Wheeled out from first manhole and where the end is, and off in the sidewalk we found an unmarked manhole. opened and determined this was a CMP manhole and fiber closure was there.
2025-05-29: 1 tech 3 hours || When tech got to the customer and opened the panel, he found that the inner parts the panel were all missing. tech drove from Auburn to Buckfield to search for spare parts, then drove back to auburn to complete the job
04A100 - Two-man Construction Crew (Includes Labor, Equipment and Vehicle)
total
6.00
2025-05-28: 2 power lineman at 3 hours for same issue as CMP manholes not recorded properly
04A100 - Supervisor ( Includes labor & Vehicle)
total
3.00
2025-05-28: Assisted in locating proper manhole working with Jason Lenor, CMP supervisor. had to do our own troubleshooting to locate.
04A300 - Flaggers (per each, per hour)
total
12.00
2025-05-28: 2 flaggers at 6 hrs ea.
04B000 - Per-Diem (if overnight travel is required)
per each
03C100 - Set Up Fee (Jobs w/ Gross Value < $1,000 or > 75 mile radius from contractors office)
per each