Download JIS
8764
Date
2025-06-03
SO#
207313-003 PO0000416879
Customer
Maine Health
Address
22 Bramhall Portland
Tech Hours
24
Job Complete
Yes
Tech Names
2025-05-21: Seth, Avery, Travis
Unit
Quantity
Notes
AERIAL CONSTRUCTION UNITS
04A100 - Aerial 12 Fiber Drop (price per foot included P-hanger, preforms and lags, fiber provided by FirstLight)
per ft
04A100 - Install 5/16" Strand and pole hardware (includes strand/pole hardware in material pricing) (10M)
per ft
04A100 - Install 5/16" Strand and pole hardware (without strand in material pricing but includes pole hardware) (10M)
per ft
04A100 - Install 1/4" Strand and pole hardware (includes strand/pole hardware in material pricing) (6M)
per ft
100.00
04A100 - Install 1/4" Strand and pole hardware (without strand in material pricing but includes pole hardware) (6M)
per ft
04A100 - Re-sag plant (includes redresssing the pole…respace, shorten or lengthen lashing wire)
per span
04A100 - Wreck out (includes all hardware, strand, fiber, and disposal)
per ft
04A100 - Install/ supply 5/16" Down guy (includes appropriate hardware and 6' guard, includes strand)
per each
04A100 - Install/ supply 5/16" Down guy (includes appropriate hardware and 6' guard, without strand)
per each
04A100 - Install/ supply 5/16" Aerial guy (includes appropriate hardware and strand)
per each
04A100 - Install/ supply 5/16" Aerial guy (includes appropriate hardware, without strand)
per each
04A100 - Install/ supply 1/4" Down guy (includes appropriate hardware and 6' guard, includes strand)
per each
04A100 - Install/ supply 1/4" Down guy (includes appropriate hardware and 6' guard, without strand)
per each
04A100 - Install/ supply 1/4" Aerial guy (includes appropriate hardware and strand)
per each
04A100 - Install/ supply 1/4" Aerial guy (includes appropriate hardware, without strand)
per each
04A100 - Install/supply 5/16" sidewalk guy (includes appropriate hardware and 6' guard, includes strand)
per each
04A100 - Install/ supply 5/16" sidewalk guy (includes appropriate hardware and 6' guard, without strand)
per each
04A100 - Install/ supply 1/4" sidewalk guy (includes appropriate hardware and 6' guard, includes strand)
per each
04A100 - Install/ supply 1/4" sidewalk guy (includes appropriate hardware and 6' guard, without strand)
per each
04A100 - Install Power Vertical Bonds (includes all copper and hardware)
per each
2.00
2025-05-21: Pole 5 and Pole ½
04A100 - Install Ground Rod (includes all copper and hardware)
per each
2.00
2025-05-21: Pole 5 and Pole ½
04A100 - X-Arm Supply & Install (Fiberglass 12")
per each
04A100 - X-Arm Supply & Install (Fiberglass 24")
per each
04A100 - X-Arm Supply & Install (Fiberglass 36")
per each
04A100 - Pole Transfer - Straight
per each
04A100 - Pole Transfer - Curved
per each
04A100 - Pole Transfer - Junction
per each
04A100 - Pole Transfer - Dead End
per each
04A100 - Pole Transfer - Four Way Junction or more
per each
04A100 - Install Fiber 001 - 144 (fiber provided by FirstLight)
per ft
150.00
04A100 - Install Fiber 145 - 288 (fiber provided by FirstLight)
per ft
04A100 - Install Fiber 289 - 432 (fiber provided by FirstLight)
per ft
04A100 - Install Fiber 433 - 864 (fiber provided by FirstLight)
per ft
04A100 - Delash Only Up to 4 lashing wires
per ft
04A100 - Relash Only
per ft
04A100 - Delash / Relash
per ft
Unit
Quantity
Notes
UNDERGROUND UNITS
04A200 - Install Fiber In Conduit 1- 144f (price per foot, fiber provided by FirstLight)
per ft
550.00
04A200 - Install Fiber In Conduit 145- 431f (price per foot, fiber provided by FirstLight)
per ft
04A200 - Install Fiber In Conduit 432- 864f (price per foot, fiber provided by FirstLight)
per ft
04A200 - Install Cable in Conduit Power Space Adder
per ft
04A200 - UG Innerduct-Install 1 1/4" duct in conduit. (Innerduct provided by the contractor)
per ft/each
04A200 - UG Innerduct-Install 3/4" duct in conduit. (Innerduct provided by the contractor)
per ft/each
04A200 - UG Innerduct-Install 1/2" duct in conduit. (Innerduct provided by the contractor)
per ft/each
04A200 - Install Innerduct in Conduit Power Space Adder
per ft/each
04A200 - Install 2" 3 cell-Maxcell in Conduit. (Maxcell provided by contractor)
per ft/each
391.00
04A200 - Install 2" 3 cell Maxcell in Conduit Power Space Adder. (Maxcell provided by contractor)
per ft/each
04A200 - Rod & Rope & Mule tape (price per foot including detectable muletape)
per ft
200.00
04A200 - Rod & Rope & Mule tape in Conduit Power Space Adder
per ft
04A200 - Open Trench in Grass (Install 2" conduit or less)
per ft
04A200 - Open Trench in Grass (Install greater than 2" up to 4" conduit)
per ft
04A200 - Open Trench in Asphalt / Concrete (Price based on local restoration specifications-most likely a bid job)
per ft
04A200 - Directional Drill (1) 2" conduit or less
per ft
04A200 - Directional Drill Rock Adder
per ft
04A200 - Install 17x30x17 Fiberglass Hand Hole, 20K lb. cover rating (Firstlight will provide hand hole)
per each
04A200 - Install 24x36x30 Cement Handhole w/locking cover, 20k lb cover rating (Firstlight will provide hand hole)
per each
04A200 - Install Round 8" Fiberglass Fiber ped- Charles Industry BDG3 (Firstlight will provide ped)
per each
04A200 - Install 6' copper ground rod in fiber ped or hand hole, this is so we can bond our shielded fiber/closure safely
per each
04A200 - UnRack/Rack Telecom Manhole Splice
per each
04A200 - UnRack/Rack Power Manhole Splice
per each
04A200 - Pump (De-Water) Manhole
per each
Unit
Quantity
Notes
BUILDING UNITS
04A100 - Site Survey (PDF MOP prepared)
per each
04A100 - Building Attachment
per each
04A100 - Cleat cable to pole or building
per foot
10.00
04A100 - Wall Bore Building Entry Wood/Brick/Block up to 4"
per each
04A100 - Interior Core Wood/Drywall all sizes
per each
04A100 - Concrete Core 2" to 4" Wall/Floor includes fire stop
per each
04A100 - Rod & Rope interior empty or occupied conduit including non-detectable muletape
per each
190.00
04A100 - Install Interior Plenum Fiber (price per foot, fiber provided by FirstLight)
per ft
04A100 - Install Interior 1" Plenum Duct (zip tied in crawl space, chase way, conduit or ceiling area)
per ft
Unit
Quantity
Notes
SPLICING UNITS
04B000 - Install Fiber Rack/Wall/Pole mount FDP and splice 6 fibers (FDP supplied by FirstLight)
per each
04B000 - Install Fiber Rack/Wall/Pole mount FDP and splice 12 fibers (FDP supplied by FirstLight)
per each
1.00
2025-05-21: installed 1 rack mount spliced 12 and layed dead tubes of remaining 36 fibers on top of splice tray for future.
04B000 - Install/Supply backboard (contractor provides the plywood backboard)
per each
04B000 - Enter Fiber FDP/Rack/Wall/Pole Mount/ONT/Cabinet (SPLICING/PATCHING STRANDS THRU ONLY)
per each
1.00
2025-05-21: Entered 1 cabinet patched 2 ports
04B000 - Install 6 pack w/pigtail in rackmount and splice 6 fibers (Provided by Firstlight)
per each
04B000 - Install 12 pack w/pigtail in rackmount and splice 12 fibers (Provided by Firstlight)
per each
04B000 - Install SNAP (Residential fiber closure)
per each
04B000 - Open / Split buffer tube in existing SNAP
per each
04B000 - Prep additional fiber into SNAP
per each
1.00
04B000 - Enter SNAP (SPLICING/PATCHING STRANDS THRU ONLY)
per each
1.00
04B000 - Coyote Drop Enclosure(DTC-101) (For Fiber Drop Restoration) (Provided by contractor)
per each
04B000 - Install additional fiber tail into fiber closure (Tyco's, Coyotes & Raychems)
per each
04B000 - Prep/Install Ring Cut Splice Closure (Tyco C or D)
per each
04B000 - Prep/Install Butt Splice Closure (Tyco C or D)
per each
04B000 - Prep/Install end splice closure on a single fiber tail to feed a drop (Tyco C or D)
per each
04B000 - Open / Split Buffer Tube in existing fiber closure (Tyco's, Coyotes & Raychems)
per each
04B000 - Add snowshoe (adding single snowshoe to exisitng slack loop or splice) (17" snowshoe provided by contractor)
per each
04B000 - Enter Tyco/Coyote/Raychem or equivalent-(Splice prep charge less than 12 fibers spliced, anything over 12, the entry fee charge is waved.)
per each
04A100 - Strap Out Splice Closure (Deltec / Heads)
per each
04A100 - De/Re Splice Enclosure
per each
04B000 - Fiber Splices 1-12
per fiber
4.00
04B000 - Fiber Splices 13-36
per fiber
04B000 - Fiber Splices 37-60
per fiber
04B000 - Fiber Splices 61-72
per fiber
04B000 - Fiber Splices 73-96
per fiber
04B000 - Fiber Splices 97-144
per fiber
04B000 - Fiber Splices >145
per fiber
04B000 - 1-36 Ribbon (1 to 3 ribbon, price per ribbon)
per ribbon
04B000 - 36-72 Ribbon (3 to 6 ribbon, price per ribbon)
per ribbon
04B000 - > 72 Ribbon (price per ribbon)
per ribbon
04B000 - Ribbonizing/De-ribbonizing per ribbon
per ribbon
Unit
Quantity
Notes
SPLICING MATERIAL
Materials - 04D100 - Add closure Tyco C
per each
Materials - 04D100 - Add closure Tyco D
per each
Materials - 04D100 - Add closure Tyco 600
per each
Materials - 04D100 - Add tray Tyco C
per each
Materials - 04D100 - Add tray Tyco D or 600
per each
Materials - 04D100 - Add Slack Basket Tyco C
per each
Materials - 04D100 - Add Slack Basket Tyco D or 600
per each
Materials - 04D100 - Add Mounting Bracket Tyco 600
per each
Materials - 04D100 - Add Mounting Bracket Tyco D or C
per each
Materials - 04D100 - Add Gel drop seal kit for Tyco
per each
Unit
Quantity
Notes
ADDITIONAL UNITS
04A300 - Police Detail (billed at cost plus 10% TBD by each Town)
total
04B000 - Fiber Splicer (Including Labor, Equipment and Vehicle)
total
3.00
2025-05-21: x 3 techs (9 hours total) Assigned strand was not making it to first splice location from cabinet, worked with engineer to find a new pathway. Had to add another splice point before splice 1 to remedy the issue
04A100 - Two-man Construction Crew (Includes Labor, Equipment and Vehicle)
total
04A100 - Supervisor ( Includes labor & Vehicle)
total
04A300 - Flaggers (per each, per hour)
total
8.00
2025-05-21: x for 2 flaggers (16 total)
04B000 - Per-Diem (if overnight travel is required)
per each
03C100 - Set Up Fee (Jobs w/ Gross Value < $1,000 or > 75 mile radius from contractors office)
per each